Crystal Mtn Blvd E - SR 410 to Crystal Mtn Ski Area (CRP 5738)

Winding road next to a mountain

What's Happening


The project is suspended for the winter as of November 20, 2015. When the work resumes in 2016 the contractor, Strider Construction, will be on site continuing the following activities:
  • Excavating and replacing Culverts 2 and 3.
  • Completing the rock drilling and rock nail installation.
  • Preparing the road for overlay with hot mix asphalt.
  • Remove and replace guardrail.

About the Project


This project preserves and improves 6.1 miles of Crystal Mountain Boulevard East from SR 410 to the Crystal Mountain Ski Area
(CRP 5738)
. The work will include the following:
  • Replacement of three culverts with precast bridge structures.
  • Resurfacing the existing road.
  • Guardrail replacement.
  • Rock slide protection.

Project Timeline



April 27, 2015: Pierce County awarded the contract to Strider Construction Co. Inc.

June 2, 2015: Pierce County hosted the Pre-Construction Meeting

June 29, 2015: Pierce County issues the Notice To Proceed

Nov. 20, 2015: Winter suspension

Summer 2016: Work resumes

Spring 2017: Anticipated Substantial Completion

Spring 2017: Anticipated Physical Completion
Contact Us
Send a message arrow
Henry Gertje, P.E.
Construction Supervisor
Phone: (253) 798-6826
Strider Construction Co. Inc.
Contractor
Phone: (360) 380-1234
Address:
4301 South Pine Street, Suite 628
Tacoma, WA 98409
Address:
4721 Northwest Dr.
Bellingham, WA 98226