Engineering: This project is in the preliminary stages of engineering.

Land: Right-of-Way and/or Temporary Easement needs will be evaluated.

Survey: A topographic survey has been performed.

Environmental:
Necessary environmental permits will be obtained.

Geotechnical:
A geotechnical study will be performed.

About the Project


Planned improvements for Foothills Trail - Bridge #PRT17196-B Replacement (Program No. 6159) are intended to repair the section of Foothills Trail from South Prairie to Buckley. Improvements will include the following:
  • Replace the collapsed truss bridge with a large culvert

Project Timeline


September 2016: Begin preliminary design.
Contact Us
Send a message arrow
Kraig Shaner, P.E.
Bridge Supervisor
Phone: (253) 798-2764