Pierce County is in the preliminary design phase for this project.

About the Project

Improvements to Birch Way East at its crossing with a tributary to White River (CRP 5838) are intended to replace the existing three culverts under Birch Way E with a single box culvert.  Improvements include: 
  • Removing three 18-inch culverts.
  • Constructing a concrete box culvert.  This structure will have two lanes and paved shoulders.

Project Timeline

May 2018 to September 2018: Complete preliminary engineering and environmental documentation.

October 2018 to March 2019: Complete construction plans, specifications and estimate.

Summer 2020: Begin Construction.