Neadham Road Levee Improvement
neadham banner.jpg Contact Us

Ingo Kuchta
Civil Engineer
Email me
Ph: (253) 798-6165 

Public Works
2702 S. 42nd St.
Suite 201
Tacoma, WA 98409
Ph: (253) 798-2725
What's Happening
In-stream log jams were installed in August 2015.
About the Project
Significant flooding and channel migration events that impacted the Neadham Road community have necessitated improvements to flood and channel migration infrastructure in the area. This construction is taking place in several phases along with a program to acquire properties from willing sellers in the area.

2006-2010 Five emergency actions undertaken as a result of flooding and channel migration

2011-2012 Construction of 1,000 feet of setback levee to protect Neadham Road from channel migration

2014 Construction of a groundwater channel to mitigate for fish habitat impacts caused by emergency repairs

2015 Construction of in-stream engineered log jams to protect Neadham Road from channel migration

Neadham Road property acquisition project

Benefits include: 
  • Increased channel stability and flood storage during storm events
  • Provide additional channel migration protection of Neadham Road properties
  • Fish habitat will be enhanced through mitigation requirements