Go To Search
Click to Home
Find a Department
22nd Avenue East / 152nd Street East (CRP 5650)
78th Avenue East and 184th Street East

Project Location
Project Location
Project Photos
Project Photos
Roadway Section
Finished Intersection

What's Happening
Engineering: Finalizing the preliminary engineering phase that will provide final Right-Of-Way plans and 75% complete on construction plans.

Land: Right-Of-Way acquisitions will begin once Right-of-Way plans are complete.
About the Project
Planned improvements to the intersection of 22nd Avenue East / 152nd Street East (CRP 5650) are intended to increase the efficiency of the intersection and improve safety. The improvements would include the following:
  • Adding a westbound left-turn lane and an eastbound right-turn lane on 152nd Street East.
  • Adding a right-turn lane on northbound 22nd Avenue East.
  • Installing concrete curb, gutter, and sidewalk.
  • Installing an enclosed storm drainage system, and water quality treatment and storage facilities.
  • Installing a traffic signal system.
  • Improving intersection street lighting.
Project Timeline
April 2016 to April 2017: Complete preliminary engineering phase.

May 2017 to October 2018: Begin final engineering phase of which includes environmental documentation, acquire Right-Of-Way, complete construction plans, specifications, and estimates.

November 2018:  Advertise project for bids
Contact Us


Gregory Hess, P.E.
Design Supervisor
Ph: (253) 798-2283
Contact Us

Public Works
Tacoma Mall Office Bldg
4301 South Pine Street
Suite 628
Tacoma, WA 98409-7207
Ph: (253) 798-7250