112th Street East - 198th Avenue East to 203rd Avenue East (CRP 5590)
112th Street East from 198th Avenue E to 203rd Avenue East


Project Location

Project Photo
Right Of Way Plans
Right Of Way Plans
Roadway Section
Roadway Section

What's Happening
Engineering: Preliminary engineering was completed in August 2008.

Land: Final rights-of-way plans are complete.
About the Project
Planned improvements to 0.25 miles of 112th Street East from 198th Avenue East to 300 feet west of 203rd Avenue East (CRP 5590) are intended to improve transportation connectivity, and include the following:
  • Extend 112th Street East to connect with the future 198th Avenue East.
  • Provide a westbound right turn lane at 198th Avenue East.
  • Provide concrete curbs, gutters, sidewalks and retaining walls.
  • Provide enclosed storm drain system, as well as stormwater treatment and storage facilities.
Project Timeline
August 2008: Preliminary engineering was completed.

Beyond August 2008: Right-of-way acquisition, final engineering and construction on hold pending funding availability.