Crystal Mtn Blvd E - SR 410 to Crystal Mtn Ski Area (CRP 5738)
Crystal Mountian Blvd
            

Project
Location

Project
Photos

Roadway
Section


Contract
Specs


Contract
Plans


Bid
Tabs


What's Happening
The project is suspended for the winter as of November 20, 2015. When the work resumes in 2016 the contractor, Strider Construction, will be on site continuing the following activities:
  • Excavating and replacing Culverts 2 and 3.
  • Completing the rock drilling and rock nail installation.
  • Preparing the road for overlay with hot mix asphalt.
  • Remove and replace guardrail.
About the Project
This project preserves and improves 6.1 miles of Crystal Mountain Boulevard East from SR 410 to the Crystal Mountain Ski Area
(CRP 5738)
. The work will include the following:

  • Replacement of three culverts with precast bridge structures.
  • Resurfacing the existing road.
  • Guardrail replacement.
  • Rock slide protection.
Project Timeline
April 27, 2015: Pierce County awarded the contract to Strider Construction Co. Inc.

June 2, 2015: Pierce County hosted the Pre-Construction Meeting

June 29, 2015: Pierce County issues the Notice To Proceed

Nov. 20, 2015: Winter suspension

Summer 2016: Work resumes
                       
Spring 2017: Anticipated Substantial Completion

Spring 2017: Anticipated Physical Completion 

Contact Us

Henry Gertje, P.E.
Construction Supervisor
Ph: (253) 798-6826
Contact Us

Public Works
Tacoma Mall Office Bldg
4301 South Pine Street
Suite 628
Tacoma, WA 98409-7207
Ph: (253) 798-7250

Contractor
Strider Construction Co. Inc.

4721 Northwest Dr.
Bellingham, WA 98226
Ph: (360) 380-1234