Canyon Road East - 192nd Street East to Frederickson Industrial Park Road East (CRP 5666)
Canyon Rd E - 192nd St E to Frederickson Industrial Park Rd E


Project Location

Project Photo

Roadway Section

What's Happening
Engineering: We're completing the preliminary engineering for the project.  We've completed vertical alignment and storm drainage conveyance and treatment design.

Survey:
Pierce County Survey crews will be on site collecting necessary field data.
About the Project
Planned improvements to Canyon Road East from 192nd Street East to Frederickson Industrial Park Road East (CRP 5666) are intended to enhance safety and relieve traffic congestion. Improvements would include the following:
  • Expanding to five lanes with a two-way left turn lane.                      
  • Adding widened shoulder, concrete curbs, gutters, and sidewalks.
  • Adding street lighting.
  • Adding a traffic signal at 184th Street East.
  • Adding an enclosed storm drain system, as well as stormwater treatment and storage facilities. 
Project Timeline
April 2015 to February 2017: Complete preliminary engineering and right-of-way plans.

February 2017 to December 2017: Complete right-of-way acquisition, environmental documentation, construction plans, and specifications.

Summer 2018: Construction.
Contact Us

Patrick Baughman, P.E., PMP
Design Supervisor
Ph: (253) 798-3157
Contact Us

Public Works
Tacoma Mall Office Bldg
4301 South Pine Street
Suite 628
Tacoma, WA 98409-7207
Ph: (253) 798-7250