2016 Guardrail Program (Various Locations)
2016 Guardrail Program (Various Locations)

What's Happening
Engineering: Pierce County is in the early stages of design engineering for the project. Currently we are gathering information about the existing conditions and coordinating with utility companies.

Land: All improvements are expected to fit within the existing right of way.
About the Project
The 2016 Guardrail Program (CRP 5821) involves installing guardrail and guardrail reflectors at various locations (also called "Groups") throughout the County. Locations include the following:

Group 1:
  • Bridge #23193-A at Clover Creek
Group 2:
  • Bridge #8174-A at South Fork Muck Creek
Group 3:
  • Bridge #22174-D at Tanwax Creek
Group 4:
  • Wollochet Drive Northwest (MP 1.20 to 1.25)
Group 5:
  • Rosedale Street Northwest (MP 1.22 to 1.25)
Project Timeline
June 2016 - October 2016: Gathering of field data; Design engineering; Development of construction plans, specifications, and estimates. 

Winter 2016 - 2017: Construction begins
Contact Us

Kraig Shaner, P.E.
Bridge Supervisor
Ph: (253) 798-2764
Contact Us

Public Works
Tacoma Mall Office Bldg
4301 South Pine Street
Suite 628
Tacoma, WA 98409-7207
Ph: (253) 798-7250