92nd Ave E / 224th St E (CRP 5819)
92nd Ave E and 224th St E

Project Location

Project Photo

Roadway Section

What's Happening
Engineering: We're beginning the preliminary engineering for the project. Currently we're gathering information about the existing conditions and will be coordinating with utility companies.

Survey: County surveyors will be in the area gathering field data of the project area.
About the Project
Planned improvements to the intersection of 92nd Avenue East and 224th Street East (CRP 5819) are intended to improve safety and traffic operations. The improvements would include the following:
  • Installing a traffic signal system
  • Adding an eastbound left-turn lane and westbound left-turn and right-turn lanes at the 92nd Avenue East / 224th Street East intersection.
  • Adding a two-way left-turn lane west of 90th Avenue East and between 90th Avenue East and 92nd Avenue East.
  • Installing concrete curb, gutter, and sidewalk.
  • Installing an enclosed storm drainage system, as well as stormwater treatment and storage facilities.
  • Installing street lighting.
Project Timeline
June 2016 to Spring 2017: Gather field data; complete preliminary engineering, construction cost estimate, and preliminary right-of-way plans. 

To Be Determined: Right-of-way acquisition, final engineering, and construction.
Contact Us

Gregory Hess, P.E.
Design Supervisor
Ph: (253) 798-2283
Contact Us

Public Works
4301 South Pine Street, 
Suite 628
Tacoma, WA 98409