92nd Avenue East / 224th Street East (CRP 5819)
92nd Ave E and 224th St E


Project Location

Project Photo

Roadway Section

What's Happening
Engineering: We're beginning the preliminary engineering for the project. Currently we're gathering information about the existing conditions and will be coordinating with utility companies.

Survey: County surveyors will be in the area gathering field data of the project area.
About the Project
Planned improvements to the intersection of 92nd Avenue East / 224th Street East (CRP 5819) are intended to improve safety and traffic operations.  Improvements would include the following:
  • Installing a traffic signal system
  • Adding an eastbound left-turn lane and westbound left-turn and right-turn lanes at the 92nd Avenue East / 224th Street East intersection.
  • Adding a two-way left-turn lane west of 90th Avenue East and between 90th Avenue East and 92nd Avenue East.
  • Installing concrete curb, gutter, and sidewalk.
  • Installing an enclosed storm drainage system, as well as stormwater treatment and storage facilities.
  • Installing street lighting.
Project Timeline
June 2016 to Spring 2017: Gather field data; complete preliminary engineering, construction cost estimate, and preliminary right-of-way plans. 

To Be Determined: Right-of-way acquisition, final engineering, and construction.
Contact Us

Gregory Hess, P.E.
Design Supervisor
Ph: (253) 798-2283
Contact Us

Public Works
Tacoma Mall Office Bldg
4301 South Pine Street
Suite 628
Tacoma, WA 98409-7207
Ph: (253) 798-7250