Engineering: This project is in the preliminary stages of engineering.

Land: Right of Way and/or Temporary Easement needs will be evaluated.

Survey: 
A topographic survey has been performed.

Environmental: 
Necessary environmental permits will be obtained.

Geotechnical: A geotechnical study will be performed.
About the Project
Planned improvements to 72nd Street East - 270 ft w/o Bentley Road (CRP 5845) are intended to repair the slide that occurred along the north side of 72nd Street East in December of 2015. 
Project Timeline
Fall 2016: Begin preliminary design. 

Spring 2017: Right of Way/Easement acquisition

2018: Construction.
Contact Us

Kraig Shaner, P.E.
Bridge Supervisor
Ph: (253) 798-2764
Contact Us

Public Works
Tacoma Mall Office Bldg
4301 South Pine Street
Suite 628
Tacoma, WA 98409-7207
Ph: (253) 798-7250