Foothills Trail - Bridge #PRT17196-B Replacement
ProjectHeaderPhoto.jpg


Project
Location

Project
Photo

What's Happening
Engineering: This project is in the preliminary stages of engineering.

Land: Right-of-Way and/or Temporary Easement needs will be evaluated.

Survey: A topographic survey has been performed.

Environmental: 
Necessary environmental permits will be obtained.

Geotechnical: 
A geotechnical study will be performed.
About the Project
Planned improvements for Foothills Trail - Bridge #PRT17196-B Replacement (Program No. 6159) are intended to repair the section of Foothills Trail from South Prairie to Buckley. Improvements will include the following:
  • Replace the collapsed truss bridge with a large culvert
Project Timeline
September 2016: Begin preliminary design.
Contact Us

Kraig Shaner, P.E.
Bridge Supervisor
Ph: (253) 798-2764
Contact Us

Public Works
Tacoma Mall Office Bldg
4301 South Pine Street
Suite 628
Tacoma, WA 98409-7207
Ph: (253) 798-7250