38th Avenue East / 152nd Street East (CRP 5835)
38th Ave E 152nd St E
                        

Project Location

Project Photo

What's Happening
Engineering: We're beginning the preliminary engineering phase for this project.

Survey: County surveyors will be working in or near the intersection picking up field data of the project area.
About the Project
Planned improvements to the intersection of 38th Avenue East / 152nd Street East (CRP 5835) are intended to increase the efficiency of the intersection and improve safety. Improvements will include the following:
  • Installing a traffic signal system and illumination at the intersection.
  • Installing concrete curb, gutter, and sidewalk at the four quadrants.             
Project Timeline
October 2016 to Winter 2017: Gather field data, complete preliminary engineering, and preliminary right-of-way plans.

To Be Determined: Right-of-Way acquisition, final engineering, and construction.
Contact Us

Gregory Hess, P.E.
Design Supervisor
Ph: (253) 798-2283
Contact Us

Public Works
Tacoma Mall Office Bldg
4301 South Pine Street
Suite 628
Tacoma, WA 98409-7207
Ph: (253) 798-7250