Word on the Street: Improvements to 176th Street East (B Street East to 14th Avenue East)

What's Happening
We're improving 0.84 miles of 176th Street East from B Street East to 14th Avenue East (CRP 5471). Improvements, designed to improve safety and relieve traffic congestion, include:

  • Expanding to four lanes and paved shoulders with a raised median or U/left-turn lane at designated locations.
  • Adding concrete curbs, gutters and sidewalks.
  • Adding street lighting.
  • Adding an enclosed storm drain system as well as stormwater treatment and storage facilities.
  • Improving the traffic signal at B Street East.

The 176th Street East corridor improvements also include the following County Road Projects (CRP's):

  • CRP 5536 - 14th Avenue East to Waller Road East
  • CRP 5537 - Waller Road East to 51st Avenue East
  • CRP 5762 - 1000 feet east of Canyon Road East to Gem Heights Drive East currently under construction.


Roadway Section


July 2009

  • Engineering: Geotechnical work is continuing for drainage facilities. Wall and barrier types and locations are being analyzed. Construction plans are at 60% completion.
  • Land: Have ordered some appraisals for the needed property and easements. When the appraisals are complete, offers will be presented to the respective property owners, as funds allow.


  • 2003 to 2010: Design engineering, plan development , estimates, environmental permitting: approximately 70% complete; remaining efforts will be accomplished when additional funds become available.
  • 2009 to 2010: Acquire right-of-way property and easements; approximately 25% complete; remaining efforts will be accomplished when additional funds become available.
  • Construction: To be determined, subject to available funding.


Small Vicinty Map

(click to enlarge)

Small Project Photo
(click to enlarge)


How does the money get spent?

  • Engineering: $1.2 million
  • Right-of-Way Acquisition: $6.0 million
  • Construction: $10.6 million

Where does the money come from?

  • County Road Fund and 2nd Real Estate Excise Tax: $1.8 million
  • Other: $0.2 million
  • Unfunded: $15.8 million


Greg Hess

Gregory M. Hess, P.E.
Engineering Resources Supervisor

More Details
Find more details such as revenues, cash flow, and previous fact sheets.

Contact - Engineering Resources Supervisor
Email: Gregory M. Hess, P.E
Phone: (253) 798-2283

Pierce County Public Works and Utilities
4301 South Pine Street, Suite 446
Tacoma, WA 98409-7207

CRP 5471 | January 2010


Facebook
Fan us on Facebook


Twitter
Follow us on Twitter


Youtube
Watch us on Youtube



Privacy Policy | Text Only Version | Webmaster

Copyright ©1996-2011 Pierce County Washington. All rights reserved. Last Modified Sep 8 2011 8:55AM.