What's Happening We're improving approximately 1 mile of Wollochet Dr NW from 40 St NW to East Bay Dr NW(CRP 5696). Improvements, designed to relieve traffic congestion, include:
- Expanding the roadway to 3 lanes between 40th Street NW and Artondale Drive NW.
- Expanding the roadway to 4 lanes between Artondale Drive NW and East Bay Drive NW.
- Adding turn lanes at intersections.
- Adding concrete curbs, gutter, and sidewalks.
- Adding street lighting.
- Adding an enclosed storm drain system as well as stormwater treatment.
- Improving the existing traffic signals at 40th Street NW, Artondale Drive NW, and East Bay Drive NW.
|
Schedule
- 2010, June: Pierce County awards the project to Tucci and Sons.
- 2010, July: Pre-Construction Meeting.
- 2010, July 6: Notice To Proceed date.
- 2010, July-Sept: First Utility Window.
- 2010, Oct - Dec: Southbound lane closure.
- 2010, Dec: Winter suspension.
- 2011, June: Construction resumes.
- 2011, Nov: Informational Open House.
- 2011, Aug: Second Utility Window.
- 2011, Dec: Winter suspension.
- 2012, March: Construction resumes.
- 2012, Spring-Fall: Construction continues.
- 2012, Fall: Anticipated Substantial Completion Date, Physical Completion Date.
|
Related Projects in the Area Pierce County is continuing to improve the Wollochet corridor with the following projects:
- CRP 5696: Wollochet Dr NW, 40 St NW to East Bay Dr NW (This Web Page)
- CRP 5542: Wollochet Dr NW, East Bay Dr NW to Fillmore Dr NW (Click)
- CRP 5777: Wollochet Dr NW, Fillmore Dr NW to Hunt St NW, Group 5 of the 2012 Asphalt Overlays (Click)
|
The Latest
- The Utility Window ended on 9 March 2012.
- Tucci and Sons has constructed a temporary signal system and has resumed work on the retaining walls.
- Tucci and Sons is also working on clearing and grubbing, sidewalk construction, curb and gutter, and slope construciton throughout the site.
- Two lanes of traffic will be allowed to pass through the project area.
- Intermittent one-lane alternating traffic will be necessary to accommodate some construction activities.
- Click Here for an electronic copy of the latest informative newsletter (pdf, 1.15 MB).
|
Click Here for a full size image.
|
The Southbound lanes are not closed at this time. However, if a lane closure is needed in the future, the following detour will apply:

For Southbound Traffic
- Turn Right at Artondale Dr NW
- Turn Left at 70 AV NW
- Turn Left at 40 AV NW
- Turn Right at Wollochet DR NW
|
Travelers to and from Fox Island may follow a longer detour route to avoid the construction area:
|
|
From Fox Island to State Route 16 (Click Here to view a map)
- Cross the Fox Island Bridge and continue on Warren DR NW
- Turn Left at 70 AV NW
- Turn Left at Artondale Dr NW
- Turn Right at 68 ST NW
- Turn Right at Rosedale ST NW
- Turn Right at 46 AV NW/Skansie AV
- Turn Left at Hunt ST NW
- Turn Left at Wollochet DR NW
- Arrive at SR 16
| | | |
From State Route 16 to Fox Island (Click Here to view a map)
- Exit SR 16 heading South on Wollochet DR NW
- Turn Right at Hunt ST NW
- Turn Right at 46 AV NW/Skansie AV
- Turn Left at Rosedale ST NW
- Turn Left at 78 AV NW
- Turn Left at Whitmore DR NW
- Turn Right at 70 AV NW
- Turn Right at Warren DR NW
- Arrive at Fox Island Bridge
|
 | |
Henry Gertje, P.E. Construction Engineering Supervisor |
|
|
|
|
More Details Find more details such as project Bid Tabulations, Vicinity Map, and additional project photos.
Contractor: Tucci & Sons, Inc. 4224 Waller Rd. E. Tacoma, WA 98443 (253) 922-6676
http://www.tucciandsons.com/index.html
Pierce County - Construction Engineering Supervisor: Email Henry Gertje, PE Phone: (253) 798-6826
Pierce County Public Works and Utilities Construction Engineering 4301 South Pine Street, Suite 446 Tacoma, WA 98409-7207
CRP 5696 | May 2012
|
|
|