Engineering: We are in the Preliminary Engineering Phase of the project, which includes determining the project limits, lane widths, and configuration.
Land: Parcel maps and property owner lists are being prepared.
Survey: A survey, identifying existing roadway and right-of-way limits, is complete.
September 2010 to October 2011: Preliminary design.
Beyond October 2011: Final design, right-of-way acquisition, environmental permitting, and construction are all dependent on getting additional funding. The schedule for these activities has not been determined.