Public Works & Utilities >> County Road Projects >> 176th Street East (1,000 feet East of Canyon Road East to Gem Heights Drive East)


What's Happening
We're improving 2.3 miles of 176th Street East from approximately 1,000 feet east of Canyon Road East to Gem Heights Drive East. Improvements designed to improve safety and relieve traffic congestion include:

  • Expanding to four lanes and paved shoulders with a median or U/left-turn lane at limited locations.
  • Adding concrete curbs, gutters, and sidewalks.
  • Adding street lighting.
  • Adding an enclosed storm drain system as well as stormwater treatment and storage facilities.
  • Adding new traffic signals at 70th Avenue East and 74th Avenue East.

The Latest
The project is suspended for the winter:

  • The first two lifts of asphalt are complete.
  • Winter suspension began November 10th.


roadway section


Looking West from 90 Av E, 1/24/2012



Picture of Henry

Henry Gertje, P.E.
Construction Engineering Supervisor

More Details
Find more details such as project Bid Tabulations, Vicinity map, and additional project photos.

Contractor:
Goodfellow Brothers, Inc.
P.O. Box 1419
Maple Valley, WA 98038

For additional project information and concerns please contact the Main Office.
Phone: (425) 432-2202
Email: Toddf@goodfellowbros.com


Pierce County - Construction Engineering Supervisor:
Email: Henry Gertje, P.E.
Phone: (253) 798-6826

Pierce County Public Works and Utilities
Construction Engineering
4301 South Pine Street, Suite 446
Tacoma, WA 98409-7207

CRP 5762 | Jan 2012


Privacy Policy | Text Only Version | Webmaster

Copyright ©1996-2012 Pierce County Washington. All rights reserved. Last Modified Jan 24 2012 1:57PM.