Word on the Street: Replacement of Bridge #36193-A, 176th Street East, Tacoma Rail Overcrossing
What's Happening
This project (CRP 5387) will provide for the improvements of 176th Street East at its overcrossing of the Tacoma Rail Line. Improvements, designed to improve safety and relieve traffic congestion, include:
- Remove the existing single span 2 lane bridge.
- Reconstruct the new bridge and approach roadways.
- The new bridge will be a single span, prestressed, concrete girder bridge that will be 76' long.
- The bridge will be five lanes wide with paved shoulders and 6' raised sidewalks on both sides.
- Modify the existing storm drainage system to include stormwater storage and treatment facilities.