This project is one of a series of sewer improvement projects that are progressively providing sanitary sewer service to the Elk Plain area near Mountain Highway E (SR 7).

Phase 1 from 152nd St. E to 176th St. E was completed in 1999. Phase 2 from 176th St. E to 192nd St. E is currently under construction (2011).

The proposed Phase 3 project will install approximately 6,000 feet of new 30-inch diameter sewer interceptor pipe as deep as 25 feet below ground and approximately 3,000 feet of 8-inch collector pipe to serve nearby properties.

An interceptor is a sewer line that receives wastewater from multiple collector pipes and transmits it to a wastewater treatment plant. Interceptors are usually 15 inches or greater in diameter.

The new pipe will connect to the Phase 2 sewer system currently under construction at B St. E and 192nd St. E. From there it will be installed along the following proposed alignment (see also maps below):

  • south along B St. to 196th St. E
  • east along 196th St. E, plus a short segment crossing SR 7 to the west
  • southeast along Ellis Lane to 8th Ave. E
  • south to SR 7 and along SR 7 to 204th St. E

The pipe's complex alignment is necessary to create a framework for connecting local properties to the sanitary sewer.

Ellis Lane before construction
B St. at 196th St. E

The Problem

Development in Pierce County's Elk Plain area is growing and there are limited sewer main lines (interceptors) that serve this vicinity. Private developers assume the cost of preparing their developments to hook up to sewer service but they can't connect until interceptors are installed. The high up-front cost of extending public sewer interceptors is prohibitive for most private developers.

The Solution

The county is funding construction of the interceptors so properties can connect to sanitary sewer service. The cost of extending the public sewer system will be offset over time through connection charges paid at the time a new property connects to the public system.

Current Status

A final engineering schedule has been developed, along with a new alignment route in the vicinity of the Walmart property.


B St Phase 3 Vicinity Map
(click to enlarge)

B St Phase 3 Project Vicinity map

B St Phase 3 Proposed Alignment

B St Phase 3 Proposed Alignment Map

B St Phases 1-3
(click to enlarge)

B St Phases 1-3 Map


(dates are approximate)
  • Preliminary Engineering: March 2012
  • Final Engineering: To be determined
  • Bid Advertisement: To be determined
  • Construction: 2015


The project is funded by sewer ratepayer fees.


Contact

Jacqueline B. Spears, P.E.
Engineering Supervisor
253-798-2739

Email

Jackie Spears

Facebook
Fan us on Facebook


Twitter
Follow us on Twitter


Youtube
Watch us on Youtube



Privacy Policy | Text Only Version | Webmaster

Copyright ©1996-2012 Pierce County Washington. All rights reserved. Last Modified Apr 10 2012 4:37PM.