Bridge #26211-A / Fox Island Bridge Preliminary TS&L Study

FoxIslandHeaderPhoto.jpg

Fox Island Bridge Marine Survey

Survey results are shown in the report found below.

What's Happening


Pierce County is monitoring the Fox Island Bridge through it's bridge inspection program. The Fox Island Bridge has a routine and UBIT (Under Bridge Inspection Truck) inspection every 24 months and an underwater inspection every 60 months. Both inspections are scheduled for 2017.

Pierce County has selected a consultant to conduct the Preliminary Type, Size and Location (TS&L) Study for the Fox Island Bridge. The consultant, HDR Engineering, has finished Phase 1 of this study. Pierce County will review documentation and public input and determine scope and budget for future work.

Pierce County is pursuing financing for the final Type, Size and Location Study.

Reports & Presentations


Phase 1 Preliminary Type, Size & Location Reports

Fox Island Open House Presentation Held on 08/02/2016​

Fox Island Boards_PRINT_Page_01.jpg
Download the Presentation (pdf)

Resident feedback from the open house can be seen here.

Fox Island Community Presentation held on 09/24/2013

Fox Island Bridge Presentation