92nd Avenue East / 224th Street East (CRP 5819)

92nd Avenue East / 224th Street East Banner

What's Happening


Engineering: We are continuing to work on the preliminary engineering for the project. This includes analyzing alignments and geometrics, figuring out storm drainage needs, coordinating with utility companies, determining right-of-way needs, and working out other project details.

Environmental: We have initiated the environmental studies and documentation for this project.

Geotechnical: A consultant has been hired to help perform geotechnical studies regarding the project pavement, stormwater facilities, retaining walls, and signal systems.

About the Project


Planned improvements to the intersection of 92nd Avenue East / 224th Street East (CRP 5819) are intended to improve safety and traffic operations. Improvements would include the following:
  • Installing a traffic signal system
  • Adding an eastbound left-turn lane and westbound left-turn and right-turn lanes at the 92nd Avenue East / 224th Street East intersection.
  • Adding a two-way left-turn lane west of 90th Avenue East and between 90th Avenue East and 92nd Avenue East.
  • Installing concrete curb, gutter, and sidewalk.
  • Installing an enclosed storm drainage system, as well as stormwater treatment and storage facilities.
  • Installing street lighting.

Project Timeline


June 2016 to December 2018:
Complete preliminary engineering, construction cost estimate, and preliminary right-of-way plans.

January 2019 to Early 2021: Right-of-way acquisition and final engineering.

Early 2021 to 2022:  Begin utility relocating and construction.