C Street South - ADA Improvements (CRP 5860)

What's Happening

New curb ramps and sidewalks will be installed on C Street South to improve Americans with Disabilities Act (ADA) accessibility and sidewalk connectivity. Construction started May 7 and is expected to be complete by mid-August. 

About the Project

 


New curb ramps that comply with ADA standards will be installed at each intersection on C Street South from Wheeler Street South through Lafayette Street South. New sidewalks will be built on both sides of C Street South between Lafayette Street South and 112th Street South.

Work hours will be from 7:30 a.m. to 5:30 p.m. Monday through Thursday. Impacts to motorists and pedestrians will be minimal. Periodic sidewalk closures will be needed. During these closures, a pedestrian detour route will be put into place.

Asphalt Patch Systems is the contractor. The construction cost is $396,775. The project is funded with a grant from the Washington State Transportation Improvement Board.

Project Timeline


February 16, 2018: Bid Opening date

March 7, 2018: Pierce County awarded the contract to Asphalt Patch Systems Inc.

April 10, 2018: Pierce County hosted the Pre-Construction Meeting

August 2018: Anticipated Substantial Completion

September 2018: Anticipated Physical Completion
Contact Us
Send a message arrow
Henry Gertje, P.E.
Construction Supervisor
Phone: (253) 798-6826
Asphalt Patch Systems
Contractor
Phone: (253) 535-2590

Address:
4301 South Pine Street, Suite 628
Tacoma, WA 98409
Address:
8812 Canyon Road East
Puyallup, WA 98371