Olson Drive KPN / 92nd Street KPN - Key Center Sidewalks (CRP 5863)

What's Happening

Engineering: We're beginning the preliminary engineering for the project.  We'll be completing the field survey of the roadway, vertical alignment design, and storm drainage conveyance design.

About the Project

Planned improvements to Olson Drive KPN / 92nd Street KPN from approximately 425 feet west of Key Peninsula Hwy KPN to 75 feet west of Key Peninsula Hwy KPN (CRP 5863) are intended to improve pedestrian accessibility and sidewalk connectivity in the project area and include the following:
  • Widening the roadway to include asphalt paved shoulders
  • Adding concrete curbs, gutters, and sidewalks.
  • Adding an enclosed storm drain system, as well as stormwater treatment facilities.

Project Timeline

January 2018 to March 2018: Complete field surveys.

March 2018 to February 2019: Complete preliminary engineering and right-of-way plans.

February 2019 and Beyond: Right-of-way acquisition, environmental documentation, construction plans, specifications, estimates, and construction.
Contact Us
Send a message arrow
Patrick Baughman, P.E., PMP
Design Supervisor
Phone: (253) 798-3157
4301 South Pine Street, Suite 628
Tacoma, WA 98409