112th Street East - 18th Avenue East to 23rd Avenue East (CRP 5872) 

What's Happening

The contractor will be removing two inches of existing pavement, adding a 2-inches of hot mix asphalt (HMA) overlay, and removing and replacing sections of curb, gutter, and sidewalk to conform to ADA guidelines.

About the Project

Planned improvements to 112th Street East from 18th Avenue East to 23rd Avenue East (CRP 5872) will resurface the roadway pavement and reconstruct curb ramps to current ADA accessibility standards. The improvements will include the following:

  • Removing and repaving the top 2-inches of asphalt concrete pavement from 18th Avenue East to 23rd Avenue East.
  • Replacing curb ramps at the 18th Avenue East, 22nd Avenue East, and 23rd Avenue East intersections with 112th Street East.

Improvements to the 112th Street East/Portland Avenue East intersection were completed within the last 2 years and are not included as part of this project.

Project Timeline

March 1, 2019: Bid Opening

March 18, 2019:
Pierce County awarded the contract to Puget Paving and Construction

May 15, 2019:
Pierce County hosted the Pre-Construction Meeting

Contact Us

Mike Smith
Construction Inspection Supervisor
Phone: (253) 798-6811

Address:
4301 South Pine Street, Suite 628
Tacoma, WA 98409

Contractor: 
Puget Paving & Construction Inc.
Phone: (253) 474-5616

Address: 
10910 26th Avenue South
Lakewood, WA 98499