Engineering: Pierce County is in the preliminary design stage.
Land: All improvements are expected to fit within the existing right-of-way.
Environmental: Necessary environmental permits will be obtained as needed.
The project involves resurfacing bridge decks at various locations throughout the County. The locations include:
Spring 2020: Begin preliminary engineering, development of construction plans, specifications, and estimates.
Fall 2020 to Spring 2021: Begin construction.